Pass Your Smoke Shaft Air Tightness Test

Pass Your Smoke Shaft Air Tightness Test

How to Pass a Smoke Shaft Air Tightness Test the 1st Time

Smoke shaft air tightness testing is becoming an increasingly important part of fire safety compliance across residential and commercial developments throughout the UK.

Whether you’re working on a high-rise apartment building, mixed-use development, student accommodation, or commercial project, ensuring smoke shafts achieve the required air leakage performance is essential to demonstrate compliance with the project’s fire strategy and secure final approval.

Unfortunately, many smoke shafts fail their initial air leakage test because of relatively minor construction defects. Poorly sealed access doors, incomplete fire stopping, gaps around service penetrations and defective junctions can all contribute to excessive air leakage.

The good news is that many of these problems can be avoided with the right preparation and quality control procedures.

In this guide, APT Sound Testing explains how smoke shaft air tightness testing works, why failures occur and, most importantly, what contractors and developers can do to achieve a first-time pass.

APT Sound Testing Services

What Is a Smoke Shaft Air Tightness Test?

A smoke shaft air tightness test measures how much fire escapes from a smoke shaft under a specified pressure difference.

Smoke shafts play a vital role in many building smoke control systems. During a fire, they provide a dedicated route for extracting smoke from protected areas, helping to maintain safer escape conditions and support firefighting operations.

However, excessive air leakage can affect the performance of the smoke ventilation system. Therefore, smoke shafts must meet the leakage criteria established by the project’s fire engineer or smoke ventilation designer.

Testing is generally carried out using specialist, calibrated air leakage equipment, such as a Retrotec blower door fan system.

The testing equipment is installed at the base of the smoke shaft, allowing the engineer to pressurise the enclosure and measure the airflow required to maintain the specified test pressure.

The resulting measurements establish whether the smoke shaft achieves the required air leakage performance and complies with the project specification.

Why Do Smoke Shafts Fail Air Tightness Testing?

Based on our experience at APT Sound Testing, many smoke shaft failures result from relatively small construction defects rather than fundamental design problems.

Even seemingly insignificant gaps can create substantial air leakage, particularly when several defects are present throughout a multi-storey shaft.

Here are some of the most common problems encountered during smoke shaft air leakage testing.

1. Poorly Sealed Smoke Shaft Access Doors

Access doors are often a major source of air leakage in smoke shafts.

Common problems include:

  • Damaged or incorrectly fitted door seals.
  • Missing compression gaskets.
  • Poorly adjusted door closers.
  • Distorted or incorrectly installed door frames.
  • Gaps around hinges, handles and other ironmongery.

Although individual gaps may appear relatively small, leakage across multiple access doors can significantly affect the overall test result.

Inspect all access doors to ensure seals are correctly fitted, continuous, and provide adequate compression when the doors are closed.

2. Inadequate Sealing Around Service Penetrations

Every service penetration through the smoke shaft enclosure must be appropriately fire-stopped and air-sealed in accordance with the project requirements.

Typical examples include:

  • Electrical containment and cable trays.
  • Fire alarm cabling.
  • Builders’ work openings.
  • Mechanical service penetrations.
  • Fixing points and associated installation openings.

One of the most common mistakes is assuming that fire stopping alone will automatically provide an adequate airtight seal.

The completed installation must satisfy both the relevant fire protection requirements and the specified air leakage performance.

3. Defective Drywall Joints and Construction Junctions

Air leakage frequently occurs where different construction elements meet.

Particular attention should be given to:

  • Plasterboard joints.
  • Movement joints.
  • Wall-to-ceiling interfaces.
  • Head details.
  • Floor slab connections.
  • Junctions between different wall systems.

Any gaps or discontinuities within the smoke shaft lining system can provide a route for air to escape.

Contractors should ensure that all joints are properly finished and sealed using suitable materials and installation methods.

4. Smoke Vent and AOV Interfaces

Smoke ventilators and Automatic Opening Vents (AOVs) should be carefully inspected before arranging the formal air tightness test.

Common defects include:

  • Incorrect actuator adjustment.
  • Damaged or deteriorated seals.
  • Ventilators failing to close completely.
  • Manufacturing defects.
  • Incorrect installation or alignment.

Even a small gap around a smoke ventilator can noticeably affect the overall leakage rate.

All smoke ventilation equipment should be correctly installed, adjusted and checked to ensure it closes properly before testing begins.

How to Prepare for a Smoke Shaft Air Tightness Test

Thorough preparation is one of the most effective ways to improve the chances of passing a smoke shaft air test on the first attempt.

Booking a test before the installation is fully complete can lead to unnecessary failures, additional remedial work and delays to the construction programme.

We recommend following these steps before arranging your test.

1. Ensure All Installation Works Are Complete

The smoke shaft should be fully constructed and ready for testing.

This includes ensuring that:

  • All access doors are installed.
  • Fire stopping works are complete.
  • Smoke vents have been installed and commissioned.
  • All service penetrations are sealed.
  • Building and finishing works are complete.

Any outstanding installation work could affect the test result, so confirm the shaft is ready before booking an engineer.

2. Carry Out a Thorough Visual Inspection

Before testing, contractors should undertake a detailed inspection of the entire smoke shaft installation.

Look particularly for:

  • Missing or incomplete sealant.
  • Unsealed service penetrations.
  • Damaged or poorly fitted access doors.
  • Gaps within plasterboard linings.
  • Open builders’ work holes.
  • Defective junctions and interfaces.

Taking the time to identify and rectify these defects before testing can save considerable time and money.

3. Consider Preliminary Leakage and Diagnostic Testing

Where possible, contractors should consider undertaking preliminary leakage investigations before the formal compliance test.

Specialist diagnostic equipment, including smoke machines, smoke pencils, thermal imaging cameras and pressure testing equipment, can help identify potential leakage paths.

This allows contractors to locate problem areas and undertake remedial works before the final test.

For larger developments, particularly those involving multiple smoke shafts, a proactive diagnostic approach can help reduce the likelihood of repeated testing and programme delays.

Best Practice Construction Tips for Airtight Smoke Shafts

A successful smoke shaft air test starts during construction, not on the day the testing engineer arrives.

Contractors should focus on creating a continuous and properly sealed airtight barrier throughout the smoke shaft enclosure.

Think of the Smoke Shaft as an Airtight Box

Every surface, joint, opening, and interface that forms part of the smoke shaft should be considered part of the overall air barrier.

A useful question to ask during construction is:

If this smoke shaft were pressurised, where could the air escape?

This simple approach encourages installers and site managers to consider potential leakage paths before they become problems.

Pay Particular Attention to Junctions

In many cases, leakage occurs at interfaces between different building elements rather than through the main construction materials themselves.

Pay close attention to:

  • Wall-to-floor junctions.
  • Wall-to-ceiling junctions.
  • Access door interfaces.
  • AOV and smoke ventilator interfaces.
  • Builders’ work openings.
  • Service penetrations.

Inspect these areas regularly throughout the construction process.

Protect Completed Seals During Construction

One frequently overlooked issue is damage caused by subsequent trades.

Even after a smoke shaft is properly sealed, later installation work can damage critical components.

Make sure that the following are protected:

  • Door gaskets and compression seals.
  • Fire stopping installations.
  • Sealant lines.
  • Smoke ventilators and associated seals.

Always undertake a final inspection immediately before the formal air leakage test.

What Happens During a Smoke Shaft Air Tightness Test?

When the testing engineer arrives on site, they will install calibrated air leakage testing equipment at the smoke shaft opening.

The shaft is then subjected to a series of pressure measurements to establish its air leakage performance.

A typical testing procedure involves the following stages:

  1. Measuring the shaft: The engineer establishes the relevant smoke shaft dimensions.
  2. Installing the equipment: A calibrated blower door fan system is fitted at the shaft opening.
  3. Connecting pressure equipment: Specialist instruments are installed to monitor pressure differences.
  4. Pressurising the shaft: The smoke shaft is subjected to the required test pressures.
  5. Recording airflow rates: The airflow required to maintain the specified pressure is measured.
  6. Analysing the results: The recorded measurements are assessed against the project requirements.
  7. Producing the test report: A formal report is issued confirming the test results and whether the specified leakage criteria have been achieved.

The final report provides evidence of the smoke shaft’s measured air leakage performance and its compliance with the relevant project specification.

How Can Contractors Improve Their First-Time Pass Rates?

The most successful contractors take a proactive approach to smoke shaft air tightness testing.

Rather than waiting until the building is nearing completion, they consider airtightness requirements from the early stages of construction.

At APT Sound Testing, we recommend the following:

  • Engage with your smoke shaft testing company as early as possible.
  • Review the fire strategy and specified leakage requirements before construction begins.
  • Ensure installation teams understand the importance of airtightness.
  • Inspect smoke shaft construction regularly.
  • Seal service penetrations immediately after installation.
  • Check access doors, smoke vents and associated seals.
  • Undertake pre-test quality inspections.
  • Consider preliminary diagnostic testing to identify potential leakage paths.

Following these straightforward steps can significantly reduce the risk of failure, minimise remedial works and help keep your construction programme on track.

Frequently Asked Questions About Smoke Shaft Air Tightness Testing

What is a smoke shaft air tightness test?

A smoke shaft air tightness test measures how much air escapes from a smoke shaft under a specified pressure difference.

The test establishes whether the shaft achieves the leakage criteria set by the project’s fire engineer or smoke ventilation designer.

Why do smoke shafts fail air leakage testing?

Most failures result from relatively minor construction defects, including poorly sealed access doors, incomplete service penetration sealing, defective plasterboard junctions, and problems with smoke ventilator seals.

Identifying and correcting these issues before testing can significantly improve the chances of achieving a first-time pass.

When should a smoke shaft be tested?

Testing should generally take place once the smoke shaft installation is complete, including access doors, fire stopping, service penetrations and smoke ventilation equipment.

A thorough pre-test inspection should also be completed to identify any potential defects.

How is a smoke shaft air test carried out?

A qualified testing engineer installs calibrated air leakage equipment at the shaft opening.

The shaft is pressurised, and the airflow required to maintain the specified pressure is measured. The results are then assessed against the project’s specified leakage criteria.

What equipment is used to test smoke shaft airtightness?

Specialist, calibrated air-leakage equipment is typically used, including blower door fan systems and pressure-measurement instruments.

Additional diagnostic equipment, such as smoke machines and thermal imaging cameras, can also help identify leakage paths.

How can I improve the chances of passing a smoke shaft air test the first time?

The best approach is to focus on preparation and quality control.

Ensure all installation work is complete, inspect access doors and service penetrations, check smoke ventilator seals, and undertake a detailed pre-test inspection. Where possible, consider preliminary diagnostic testing to identify and rectify leakage before the formal assessment.

Why Choose APT Sound Testing for Smoke Shaft Air Tightness Testing?

APT Sound Testing provides independent smoke shaft air tightness testing services throughout the UK.

Using calibrated equipment and recognised testing methodologies, we help contractors, developers, and smoke control specialists demonstrate compliance with project requirements efficiently and cost-effectively.

Our experienced engineers provide practical technical advice both before and during testing, helping clients identify potential problems and minimise the risk of unnecessary remedial works.

Whether your development involves a single smoke shaft or multiple shafts within a large high-rise residential or commercial building, we can provide reliable testing, prompt reporting and responsive technical support.

Need to arrange a smoke shaft air tightness test?

Contact APT Sound Testing today to discuss your project requirements and arrange professional smoke shaft testing.

Our team can help you prepare for testing, identify potential issues, and work toward a first-time pass.

Leave a Reply

Your email address will not be published. Required fields are marked *