Improving your Air
Test with Good Construction Detailing
Air Testing is the simplest and most popular method used
in the construction industry to confirm compliance with Part L of the Building
Regulations. The air test is simply a test of the building fabric integrity.
Draughts and heat loss often occur wherever there is a hole or gap in the
building envelope, resulting in the loss of heat/cooling which in turn will add
to energy bills.
Since April 2006, air testing has been required to be
tested for Air Permeability, in order to comply with Part L1 & L2 of the
Building Regulations. Since 2011 the air
leakage target has reduced from 10m3/hr/m2 to 5m3/hr/m2. In the next 2 years it
is expected that the target may be reduced to 3m3/hr/m2.
We provide a personal, helpful, efficient and cost
effective air test service to
our clients. Using the latest high power, portable door fans systems, we offer
air testing to all building types, ranging from small rooms, flats & houses
to office blocks & large distribution warehouses in accordance with the
Building Regulations Part L1 & L2
Our air test fan systems are compact, discreet and fit
simply into a personnel door. The system can easily be transported through
areas of limited access or up to high level areas. Many contractors use us to
undertake the testing in busy city centres or other tight access areas as we
eliminate the site disruption caused by the larger trailer type air testing
equipment.
In the event of a building failing an air test we then
offer smoke testing – both hand-puffer for dwellings and large scale smoke
testing for commercial buildings. This highlights the areas of air leakage
through the building fabric. We can then undertake a full written and
photographic survey as reference for your site management and relevant
subcontractors. We will also offer FREE advice on the best method to seal any
leaking areas. The main benefits of this are:
• Air
leakage paths are quickly identified in the event of a test failure
• A full
written air leakage report is forwarded so remedial works can start straight
away
• Building
handover/practical completion and handover can be achieved more quickly
Construction Phase
Consultancy
Air Pressure Testing has a practical ‘hands on’ approach
during building construction and prefers to be involved as practically possible
during this stage. We undertake periodic site visits to inspect the building
envelope assembly as it is constructed and provide both written and
photographic reports to enable any further works / remedial works deemed
necessary to be accurately targeted. Site visits are generally to allow us to
identify:
• Insulation
placement, continuity and effectiveness at thermal bridge junctions
• Air
barrier continuity within elements and at interfaces (particularly at
sub-contract package interfaces)
Foundation/ground floor Initial works (Air Test risk
factor 8)
a. Ensure
that any penetrations through the air barrier (e.g. service pipes) have been
dressed. Pre- formed collars, sometimes referred to as ‘top hats’, which seal
to the membrane and around the throat of the pipes are effective means of
achieving a good airtightness seal.
b. Ensure
that the wall and floor damp-proof course/membrane forms an adequate airtight
layer.
c. With
using timber frame construction, check that the sole plate is sealed to the
foundation/floor-slab.
Internal Floors (Air Test risk factor 9)
a. Using
joist hangers can limit penetrations through the air barrier.
b. If
joists are to be supported by the wall, check that there is no air leakage into
the cavity and the wall between the joists is fully filled/completed.
c. Ensure
timber floor sheets/boards are well fitted and sealed at their edges as well as
at junctions with perimeter walls with mastic.
d. Ensure
the ceiling-to-wall joint has been sealed with mastic.
Eaves Level (Air Test risk factor 8)
a. Ensure
the airtightness layer between the wall and ceiling/roof is continuous ceiling
below the roof space.
b. Ensure
there is a continuous air barrier over the whole ceiling area.
c. Ensure
all service penetrations (ventilation ducts from extract fans and light
fittings) have been properly sealed where they penetrate the air barrier as
this is a major air leakage path.
d. Ensure
all loft hatches are airtight and surrounds are sealed where they penetrate the
air barrier.
External Doors & Windows (Air Test risk factor 7)
a. Ensure
you always specify good quality windows and doors.
b. Always
check that the wall-to-frame junction is properly sealed and continuous with
mastic against the wall’s airtightness layer
c. Ensure
all windows and doors have an appropriate weather-seal between the opening unit
and the frame – check for missing weather seals.
d. All
external doors should be fitted with draught excluders.
e. Ensure
the letterbox is fitted with a draught excluder.
Envelope Service penetrations (Air Test risk factor 10)
a. Check
for seals at service entry points (pipe and cable routes), e.g. around incoming
water pipes, gas pipes, electrical cabling,
as well as waste water pipes for sinks, baths, washing machines, dishwashers, etc. Seals should be provided
internally and externally.
b. Where
multiple services penetrate at the same point, there should be sufficient space
to fully seal round each of them.
Brick/block masonry construction (Air Test risk factor 7)
a. Ensure
the quality of construction as the work proceeds. Good mortar joints are
required (i.e. no gaps around the blocks or bricks) on both internal and
external faces – this also reduces sound transmission.
b. Ensure
all block-work is paint grade and painted were possible.
c. The
application of wet plastering, parging or the addition of fully-sealed dry
lining will create a good air seal.
d. Parging
is an effective method of sealing around joists that penetrate the inner leaf
of an external wall.
e. Check
that there is a good seal around all services that penetrate the masonry.
Plasterboard Dry lining (Air Test risk factor 10)
a. Check
the plasterboard is continuous (e.g. there are no large holes behind the
kitchen units/bath).
b. Ensure
that airtightness measures have been incorporated at all edges, particularly at
the floor/ceiling junctions and around openings.
c. Check
the plasterboard is correctly detailed at joints, corners, reveals and window
sills. Plasterboard should be mounted on ribbons of plaster or adhesive around
all the edges (rather than dabs) to prevent
air leaking through the porous block-work behind.
Sealed Membranes & Vapour barriers (Air Test risk
factor 9)
a. Where
the vapour barriers have been used as the air tight barrier, check that it is
complete, that all joints have been sealed and it’s not damaged.
Timber frame
construction (Air Test risk factor 8)
a. It’s
usually easier to make timber frame dwelling airtight than other forms of
construction. This is partly due to pre-fabricated construction and the use of
the impermeable vapour barrier as the air barrier. The plasterboard layer can
also become an air tight layer.
b. Where
vapour barriers have been used special care will be needed to avoid it being
torn. Any damage to the vapour barrier must be carefully repaired.
Remedial Air Sealing Solution
1. Smoke
Investigation with Air Testing Fans:
APT’s Air Sealing Team utilise smoke investigation to
identify the air leakage paths and prioritise which can be sealed first to
attain an air test pass.
2. Remedial
Air Sealing Works:
APT can carry out the air sealing works. Typically allow
for a 2-4 man Remedial Air Sealing Team. Adequate access must be provided for
all sealing works. We provide all air sealing Materials – Rates provided on
Request.
3. On-going
Air Tightness Assessments:
Enables the APT Sealing Team to seal the building until
the fans indicate that the air
test would pass – thereby minimising the remedial works
and time on site.
4. Final
Air Test:
APT’s Air Test Technician carries out a final independent
test for compliance.
Whether you need a full on-going air tightness
design/consultancy service, or just a simple air test, Air Pressure Testing
have the knowledge and experience to ensure your building passes first time.
If you are unsure of the air tightness services you
require, please visit our website – http://www.airpressuretesting.net/,
call us on 07775 623464 or e-mail darren@airpressuretesting.net and one
of our Air Tightness Consultants will guide you through the process, ensuring
that you receive the right level of advice at the right time.